The lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam
Zhang Xiongwen,Ren Huixing
Strategic Study of CAE 2010, Volume 12, Issue 2, Pages 22-26
Keywords: Sutong Bridge large steel cofferdam fabrication lowering as a whole synchronousness controlling
Scheme comparison on large-scale infrastructure construction in shoal areas
Xian Zhengquan,Liang Jinda,Zhao Lei
Strategic Study of CAE 2010, Volume 12, Issue 4, Pages 29-32
This article described the successful experience of using steel sheetpile cofferdam on building island as pile installation platform.Constructing steel pile cofferdam in advance on cap construction instead of steel platform can reduce
Keywords: shoal area large-scale infrastructure steel sheet pile cofferdam on building island
Liang-Jiu JIA, Tsuyoshi KOYAMA, Hitoshi KUWAMURA
Frontiers of Structural and Civil Engineering 2013, Volume 7, Issue 4, Pages 466-476 doi: 10.1007/s11709-013-0219-5
Keywords: cyclic plasticity prestrain Chaboche model mild steel
Corrosion damage assessment and monitoring of large steel space structures
Bo CHEN, You-Lin XU, Weilian QU,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 3, Pages 354-369 doi: 10.1007/s11709-010-0088-0
Keywords: large steel space structure atmospheric corrosion stress corrosion cracking corrosion damage damage assessment
Phase Ⅲ RCC Cofferdam Construction of TGP
Zhang Shuguang
Strategic Study of CAE 2003, Volume 5, Issue 11, Pages 79-81
The phase Ⅲ RCC cofferdam construction belongs to the phase Ⅲ diversion works.construction site and duration, both the concreting intensity and the rise height of the phase Ⅲ RCC cofferdam
Keywords: TGP RCC cofferdam concrete
Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement
Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG
Frontiers of Engineering Management 2019, Volume 6, Issue 2, Pages 207-220 doi: 10.1007/s42524-019-0016-5
Keywords: steel structure pre-assembly BIM plane-line-point 3D measurement
The processing and precision control of large thinwall steel caisson
Peng Wu,Lin Fan,Zhao Qiang,Ma Jianle
Strategic Study of CAE 2010, Volume 12, Issue 4, Pages 21-24
Keywords: large thin-walled steel caisson processing precision control
Studies on several dynamics problems in the design of the explosion water-well with steel-inner
Gu Wenbin,Chen Xueping,Liu Jianqing
Strategic Study of CAE 2013, Volume 15, Issue 10, Pages 71-79
Keywords: design of explosion water-well with steel-inner dynamics analysis stress and strain response numericalsimulation bubble curtain concrete cofferdam
Jian GONG
Frontiers of Engineering Management 2017, Volume 4, Issue 1, Pages 106-109 doi: 10.15302/J-FEM-2017001
Keywords: super-high-rise building green building integral steel platform formwork system large volume concrete concrete pumped for super-high building deep and large foundation pit combined anterograde and retrograde
Challenge and Innovation in Sutong Bridge Foundation Proje ct
You Qingzhong,Dong Xuewu,Wu Shouchang
Strategic Study of CAE 2007, Volume 9, Issue 6, Pages 22-26
Keywords: Sutong Bridge construction platform steel cofferdam collision structure lowering as awhole permanent
Dai Huichao
Strategic Study of CAE 2003, Volume 5, Issue 7, Pages 11-16
The deep water high earth-rock cofferdam in the 2nd phase construction of TGP is a hard and challengeDuring the period from 1998 to 2002, the cofferdam protected the construction pit of the left-bank damThe quality of the cofferdam is good, and it fulfilled the historical tasks satisfactorily.research, the design and construction, the organization and management, the safety monitor and the cofferdam
Keywords: TGP deep water high earth-rock cofferdam design constraction
Design and construction of Sutong Bridge deep-water main pylon foundations
Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 38-43
This paper, from three aspects including construction conditions, foundation design and construction, introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with certain unfavorable construction conditions, such as deep water, tidal effect, soft stratum and heavy traffic, during the construction of main-pylon foundations.
Keywords: Sutong Bridge group-pile foundation steel cofferdam scour protection
Large-span high-speed railway bridges across Yangtze River and Yellow River
Gao Zongyu
Strategic Study of CAE 2009, Volume 11, Issue 1, Pages 17-21
The steel truss structure is adopted for all of these bridges of the
Keywords: large-span high-speed railway bridge steel truss structure new technology
A DSS for Management on the Jointly Discharging of Overtopped Cofferdam
Fang Debin,Wang Xianjia,Hu Zhigen
Strategic Study of CAE 2003, Volume 5, Issue 1, Pages 62-68
Management on the jointly discharging of overtopped cofferdam is a typical semi-structured problemdecision support system is designed to address the management on the jointly discharging of overtopped cofferdam
Keywords: overtopped cofferdam construction diversion management decision support system (DSS)
W.J. Lu,B. Li,J.F. Hou,X.W. Xu,H.F. Zou,L.M. Zhang,
Engineering 2023, Volume 20, Issue 1, Pages 180-191 doi: 10.1016/j.eng.2021.07.028
Keywords: Hong Kong–Zhuhai–Macao Bridge Vibratory pile driving Wave equation analysis Large-diameter steel cylinder
Title Author Date Type Operation
The lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam
Zhang Xiongwen,Ren Huixing
Journal Article
Scheme comparison on large-scale infrastructure construction in shoal areas
Xian Zhengquan,Liang Jinda,Zhao Lei
Journal Article
Prediction of cyclic large plasticity for prestrained structural steel using only tensile coupon tests
Liang-Jiu JIA, Tsuyoshi KOYAMA, Hitoshi KUWAMURA
Journal Article
Corrosion damage assessment and monitoring of large steel space structures
Bo CHEN, You-Lin XU, Weilian QU,
Journal Article
Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement
Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG
Journal Article
The processing and precision control of large thinwall steel caisson
Peng Wu,Lin Fan,Zhao Qiang,Ma Jianle
Journal Article
Studies on several dynamics problems in the design of the explosion water-well with steel-inner
Gu Wenbin,Chen Xueping,Liu Jianqing
Journal Article
Challenge and Innovation in Sutong Bridge Foundation Proje ct
You Qingzhong,Dong Xuewu,Wu Shouchang
Journal Article
Science and Technology Innovation of the Deep Water High Earth-rock Cofferdam in the Three Gorges Project
Dai Huichao
Journal Article
Design and construction of Sutong Bridge deep-water main pylon foundations
Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang
Journal Article
Large-span high-speed railway bridges across Yangtze River and Yellow River
Gao Zongyu
Journal Article
A DSS for Management on the Jointly Discharging of Overtopped Cofferdam
Fang Debin,Wang Xianjia,Hu Zhigen
Journal Article